Renovation of the Septentrion Bridge in the Var

Article phare

Featured article

BlueSpine is involved in the assessment and project management of the Septentrion Bridge in the Var.

The structure: A box girder bridge with reinforced concrete beams located in Port Grimaud (83) and dating from 1969.

The assignment: Assessment | Project Management (PC)

The client: Syndicat Cité Lacustre de Port Grimaud

Our involvement: BlueSpine is involved in the rehabilitation of the Septentrion Bridge in the famous Cité Lacustre of Port Grimaud. The studies carried out by our teams were as follows:

  • Assessment of corrosion throughout the reinforced concrete section of the bridge
  • Recommendation of the most suitable treatment for the rehabilitation of the structure
  • Preliminary design of the chosen treatment solution
  • Project management: Preliminary design / Detailed design / Construction documents / Final design / Technical supervision / Handover.
  • Inline corrections
Blog technique Presse et médias
Catégories :
Chargement des articles...
Chargement des articles de presse...

Newsletter

Receive our new articles every month. No spam, only expert advice.

*